| NSW Public Works |
Home | Search | Contact Us | About MHL | Client Pages | Services | Facilities | Data Online | Real Time Data | Tide Charts | MHL Mapping System
![]() |
|
| 3 of the 6 Solar Chimneys | Masonary Labyrinth (During construction). |
|
| Plenum air intake, (1 of 6) |
![]() |
|
| East side view with vertical timber slat shades and solar chimney. | West side view with horizontal and vertical fixed shades and external blinds on some windows. |
![]() |
|
| Sky Solutions skylight with a laser cut inner shade. | Solar powered street light with tracking solar panels. |
![]() |
|
| Roof mounted solar collector. | Under floor tank and pump. |
![]() |
|
| Installation of the 162 Cannon roof panels. | Completed Installation. |
![]() |
|
| Overall view of the building. | 3 S.E.A. inverters with protection equipment. Top Left - Insert of the inverter control panel. |
![]() |
|
| Trace Inverter with DC Disconnect, Surge protection and Battery Box. | Pump as Turbine backup generator with a motorised valve controlled by the Trace inverter. |
![]() |
|
| Platypus Power pulse width induction motor
controller, dump load (above) and valve motor controller. | Manly Dam is next to our site for the water supply. |
![]() |
|
| A typical water level recording station. | |